Herramientas

  • Home
  • En Español
  • Contacto_en
  • Map
  • RSS

Menú de navegación principal



Technical Management of the System

System Capacity

Print

Assignment of Interruptible Service


In accordance with that established in the Regulations for System Technical Management, this page contains, in the first instance and in accordance with Resolution DGPEyM 25 July 2006, the list of supply points for interruptible tolls presented and accepted within each zone.

Secondly, the list of gas pipelines classified as saturated by the System Technical Manager will also be published, after an analysis of the report presented by the transportation companies in the areas in which minimum guarantee pressures are, or could be, reached.

Capacities are expressed under the following reference conditions: [GCV at 0ºC; V(0ºC, 1.01325 bar)]. According to Annex J of ISO 6976 the factor applied for converting the GCV from 0ºC to 25ºC shall be 1/1.0026.

LNG unloading arms



  • New Assignment Points for Interruptible. Period 2012/2013
    Document in PDF (It will be opened in a new window) Download pdf 347 Kb  /   10/12/2012
  • NewRelation of gas pipelines considered to be saturated. Period between October 1st 2013 to September 30th, 2014
    Document in PDF (It will be opened in a new window) Download pdf 46 Kb  /   15/04/2013
  • Assignment Final points for interruptible. Period between October 1st 2011 to September 30th 2012
    Document in PDF (It will be opened in a new window) Download pdf 183 Kb  /   10/10/2011
  • Assignment points for interruptible. Period between October 1st 2010 to September 30th 2011
    Document in PDF (It will be opened in a new window) Download pdf 104 Kb  /   05/10/2010
  • Final Assignment points for interruptible. Period between October 1st 2009 to September 30 2010
    Document in PDF (It will be opened in a new window) Download pdf 96 Kb  /   23/10/2009
  • Interruptible toll. Simultaneousness in the firm and interruptible consumption. Criterion of delivery.
    Document in PDF (It will be opened in a new window) Download pdf 49 Kb  /   25/09/2009
  • Assignment points for interruptible. Period between October 1st 2008 to September 30 2009
    Document in PDF (It will be opened in a new window) Download pdf 125 Kb  /   24/10/2008
Install Adobe ReaderInstall Adobe Reader
Go to top


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI