Herramientas

  • Home
  • En Español
  • Contacto_en
  • Map
  • RSS

Menú de navegación principal



Gas Transmission

Capacity Secondary Market

Print

The Regulation (EC) No 715/2009 of the European Parliament and Council, states that "transmission system operators, LNG and underground storage facilities will take all reasonable steps in order to allow the free exchange of capacity rights and to facilitate this exchange in a transparent and non discriminatory way".

According to what is specified in that regulation, Enagás Transporte offers consumers a tool to facilitate the exchange of contracted capacity at its facilities.

Through this site interested parties can submit capacity offers and request for contracted capacity in facilities operated by Enagás Transporte, expanding the range initially arranged for the capacities allocated for the processes of "Open Subscription Period" for the International Connection of Larrau.

Please find below the following documents:

  • Terms and conditions of Capacity Secondary Market
  • Forms for capacity offers and requests
  • Bulletin Board, the document containing the offers and requests received. You can consult in case we have requests to publish.


Enagás Transporte will continue with the development of the secondary market platform, adapting it to potential regulatory developments and market needs.

Capacities are expressed under the following reference conditions: [GCV at 0ºC; V(0ºC, 1.01325 bar)]. According to Annex J of ISO 6976 the factor applied for converting the GCV from 0ºC to 25ºC shall be 1/1.0026.

You can download these files in PDF format. To view them, you will need Adobe Reader, which you can install for free from this page.


Capacity Secondary Market



  • Bulletin Board
    Document in PDF (It will be opened in a new window) Download pdf 35 Kb  /   06/03/2013
  • Form for capacity offers and requests
    Document in Excel (It will be opened in a new window) Download Excel 606 Kb  /   03/04/2013
  • Terms and conditions of the Capacity Secondary Market
    Document in PDF (It will be opened in a new window) Download pdf 150 Kb  /   26/02/2010
  • Model of contract for the Secondary Capacity Market
    Document in PDF (It will be opened in a new window) Download pdf 113 Kb  /   03/04/2013
Install Adobe ReaderInstall Adobe Reader
Go to top


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI